Collection bin located in the Community Center lobby through December 15th.
The Community of Harbor Bay Isle has coordinated with the City of Alameda to lower both lagoon systems on the following dates: May 12 – May 16, 2025 (Alternate Rain Dates – June 9 – 13, 2025) This is an opportunity for all homeowners to inspect their docks and curb walls for needed repairs and maintenance and complete any clean up along the lagoon edge. Remember: An architectural application is required before repairs can be made. Applications for pylons in accordance with the approved design(s) can be processed through a “fast track” approval. For application assistance email: architecture@harborbay.org. This schedule is subject to change in the event of inclement weather or if the ambient temperature should rise above 70 degrees Fahrenheit.
The Community of Harbor Bay Isle has coordinated with the City of Alameda to lower both lagoon systems on the following dates: March 31 – April 4, 2025 (Alternate Rain Dates – April 14 – 18, 2025) This is an opportunity for all homeowners to inspect their docks and curb walls for needed repairs and maintenance and complete any clean up along the lagoon edge. Remember: An architectural application is required before repairs can be made. Applications for pylons in accordance with the approved design(s) can be processed through a “fast track” approval. For application assistance email: architecture@harborbay.org. This schedule is subject to change in the event of inclement weather or if the ambient temperature should rise above 70 degrees Fahrenheit.

